首页 > English > SERVICES > Utilities

小图标 Utilities

Electric vehicle charging

Updated: 2026-02-12
Source: Shenzhen Daily

0.jpg

A supercharging station in Pingshan District. Photo by Cao Zhen

As of Oct. 31, 2025, Pingshan has built more than 400 new energy vehicle charging stations, including over 50 supercharging stations and eight photovoltaic-storage supercharging stations equipped with vehicle-to-grid (V2G) functionality.

These stations are mainly located at the convention and exhibition center, government service centers, parks, industrial parks and bus terminals. EV drivers can find charging stations using map apps, the “i深圳” app, or WeChat miniprograms.

On map apps, search for “超充” (super fast charging) or “充电” (charging) to view nearby stations. Selecting a station shows pricing, port availability and provides precise directions.

On the “i深圳” app, search “超级快充” (super fast charging) to locate nearby stations and check available ports. The app allows filtering by “super fast,” “fast,” “slow,” “V2G” and “European standard.” Typical charging times: about 7-8 hours for a full charge at a slow charger, 1-2 hours at a fast charger, and a supercharging station can deliver 80% or more in 10 minutes or less.

Tap the navigation button to get routing directions. Select “扫码充电” to scan the QR code on the charging port and start charging. The app also displays pricing, real-time availability and nearby amenities such as convenience stores or restrooms.

On the “充电在手2.0” WeChat miniprogram, operated by Shenzhen Bus Group, stations are listed by proximity or price; search “坪山” to view stations in Pingshan District.

On the “e易充电” WeChat miniprogram, operated by Shenzhen Eastern Bus Co. Ltd., stations can be sorted by proximity or price and filtered by labels such as “洗车” (car wash); search “坪山” to find Pingshan stations.